Major
Turnkey Contractors
/ Project Consultants
(like L&T, BHEL etc.) who
erect huge Power Plants (for NTPC
/ NPC etc.) as part of installation,
commissioning and handing over activity
and during performance
trials etc., may have to ensure
/ assure the quality of thousands
of (mounted)
field instruments
by calibrating these and submitting
the documents to the approving authorities.
This activity will require a dedicated
Site Calibration
facility
with
trained manpower.
Nagman Centre for Calibration accepts
to execute such total requirement
of calibration by setting up a temporary
lab at project site (say for
3 to 6 months) mobilizing Master Standards,
manpower and other facilities as required.
This full-fledged lab away from home
follows all the requirements of ISO
/ IEC 17025: 2005 & meets
the total calibration requirement
during such performance
trials / acceptance tests.
|